mille makes…

knits etc.

long vest progress November 12, 2006

Filed under: long vest — mille @ 1:20 pm

it has grown a little bit in the last week… the way the cable pattern moves a little to the left is a bonus – i didn’t see it coming, but am happy about it :)   i think it will make an interesting touch to this long vest. i have decreased the number of stiches by 18 over the last 6 reports to make it a fitted fit, and think i have succeeded in making it invisible. now, doing an invisible increase will be the next challenge… i do plan on posting the diagram for the cable/lace pattern soon.

vest-3.jpg

 

 

 

Leave a Reply